Files
claude-code/docs/plans/.completed/2026-01-05-workstation-monitoring-design.status
OpenCode Test f9e9be62bc Add pi50 resource optimization plan, mark monitoring design complete
- New plan: Improve pi50 control plane resource usage
- Completed: Workstation monitoring design status file

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-05 13:00:57 -08:00

18 lines
566 B
Plaintext

{
"plan": "2026-01-05-workstation-monitoring-design.md",
"status": "COMPLETE",
"completed_at": "2026-01-05T14:09:00Z",
"implementation": {
"node_exporter": "installed and running (v1.10.2-1)",
"scrape_config": "deployed (workstation-scrape)",
"prometheus_rule": "deployed (workstation-alerts, 12 rules)",
"prometheus_target": "UP and scraping",
"git_commit": "9d17ac8",
"network_solution": "Tailscale (100.90.159.78:9100)"
},
"verification": {
"all_success_criteria_met": true,
"verified_at": "2026-01-05T14:09:19Z"
}
}