53d075538e
- SUMMARY.md with task commit, decisions, metrics - STATE.md: Phase 2 complete (2/2 plans), ready for Phase 3
2.4 KiB
2.4 KiB
phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, duration, completed
| phase | plan | subsystem | tags | requires | provides | affects | tech-stack | key-files | key-decisions | patterns-established | duration | completed | ||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 02-config-overlays | 02 | config |
|
|
|
|
|
|
|
|
1min | 2026-02-10 |
Phase 2 Plan 2: Doctor Overlay Validation Summary
checkOverlayExists doctor check validates FLYNN_ENV overlay file exists with skip/pass/fail tristate reporting
Performance
- Duration: ~1 min (52s)
- Started: 2026-02-10T04:59:35Z
- Completed: 2026-02-10T05:00:27Z
- Tasks: 1
- Files modified: 1
Accomplishments
- Added checkOverlayExists to flynn doctor checks array
- When FLYNN_ENV is set, reports pass (file found) or fail (file missing with path detail)
- When FLYNN_ENV is not set, check is skipped silently
- Positioned after checkConfigExists, before checkConfigParses for natural validation flow
Task Commits
Each task was committed atomically:
- Task 1: Add checkOverlayExists to doctor.ts -
6bd3721(feat)
Files Created/Modified
src/cli/doctor.ts- Added checkOverlayExists check function and inserted into allChecks array after checkConfigExists
Decisions Made
- Placed overlay check between checkConfigExists and checkConfigParses — validates files exist before attempting to parse/validate them
- Used 'skip' status when FLYNN_ENV is not set to avoid noise for users not using overlays
Deviations from Plan
None - plan executed exactly as written.
Issues Encountered
None
User Setup Required
None - no external service configuration required.
Next Phase Readiness
- Phase 2 (Config Overlays) complete — both overlay merge and doctor validation shipped
- Ready for Phase 3 (Live Ops Dashboard)
Phase: 02-config-overlays Completed: 2026-02-10