37901e3c20
- SUMMARY.md documenting 3 tasks, 3 commits, 9min duration - STATE.md updated: plan 1/3 complete, metrics, decisions, technical notes
2.1 KiB
2.1 KiB
State: Flynn Operator DX
Project Reference
Core Value: Make Flynn easier to reason about, configure, and monitor Milestone: Operator DX Phases: 3
Current Position
Phase: 1 — Daemon Decomposition Plan: 1 of 3 complete (01-01 done, next: 01-02) Status: executing Progress: ░░░░░░░░░░ 0/3 phases (phase 1 in progress)
Phase Status
| Phase | Status | Plans |
|---|---|---|
| 1 — Daemon Decomposition | executing | 1/3 plans complete |
| 2 — Config Overlays | not_started | — |
| 3 — Live Ops Dashboard | not_started | — |
Performance Metrics
| Metric | Value |
|---|---|
| Test count | 1077 (baseline, verified) |
| daemon/index.ts lines | 458 (from 1088 baseline, -58%) |
| Plan 01-01 duration | 9 min |
| Plan 01-01 tasks | 3/3 |
Accumulated Context
Key Decisions
- Decompose god file incrementally, not rewrite
- Config overlays over separate files
- Extend existing vanilla JS dashboard
- Skip structured logging — dashboard will reveal what metrics matter
- Factory function pattern (initX(deps) → result) for daemon subsystem extraction
- initTools() kept synchronous — only shutdown callbacks are async
- Backward-compatible re-exports from daemon/index.ts for model functions
Technical Notes
- daemon/index.ts now 458 lines — models, memory, tools extracted to dedicated modules
- Pre-existing routing.ts and agents.ts extractions found (not from our plan)
- Factory pattern: initMemory(deps) → { memoryStore, hybridSearch, memoryDir }, initTools(deps) → { toolRegistry, toolExecutor, browserManager }
- Tier 1 agent tools remain in daemon/index.ts (depend on later-created objects)
- Web dashboard is vanilla JS SPA at src/gateway/ui/
- Config loader at src/config/loader.ts, schema at src/config/schema.ts (409 lines)
TODOs
(none yet)
Blockers
(none)
Session Continuity
Last session: Plan 01-01 (extract models/memory/tools) completed Stopped at: Completed 01-01-PLAN.md Next action: Execute Plan 01-02 (extract routing/channels) or continue Phase 1
State initialized: 2026-02-09 Last updated: 2026-02-10