3.3 KiB
3.3 KiB
phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, duration, completed
| phase | plan | subsystem | tags | requires | provides | affects | tech-stack | key-files | key-decisions | patterns-established | duration | completed | ||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 03-live-ops-dashboard | 02 | gateway-ui |
|
|
|
|
|
|
|
|
unknown (implementation commit predates this summary backfill) | 2026-02-13 |
Phase 3 Plan 2: Live Ops Dashboard UI Summary
Extended the existing dashboard with live counters, model performance telemetry, event stream, and active request visibility, backed by Phase 3 Plan 1 RPC endpoints.
Performance
- Summary date: 2026-02-13
- Tasks: 2/2 (implementation + closure/verification)
- Files modified: 2
Accomplishments
- Implemented dashboard sections for core counters, model metrics table, event stream, active requests, and channels
- Wired RPC calls to
system.metrics,system.events,system.activeRequests,system.health, andsystem.channels - Added 3-second fast refresh for dynamic ops data and 10-second slow refresh for health/channel state
- Added event stream and model summary styling in shared gateway UI stylesheet
Task Commits
Implementation was already present in commit history and is now formally closed with planning artifacts:
- Task 1: Extend dashboard page with live ops sections -
c3ca3f3(feat) - Follow-up style cleanup -
6090508(style)
Files Created/Modified
src/gateway/ui/pages/dashboard.js- Live ops dashboard structure, polling, and targeted section updatessrc/gateway/ui/style.css- Event stream and model metrics summary styles
Verification
Automated checks run during this closure:
pnpm typecheck✅pnpm build✅pnpm test:run✅ (1590/1590 passed)
Manual browser verification (visual sanity check) remains recommended as a final operator check.
Deviations from Plan
No functional deviations. This summary was backfilled after implementation had already landed.
Issues Encountered
None
User Setup Required
None
Next Phase Readiness
- Phase 3 is complete from an implementation and automated validation perspective
- Milestone artifacts are now synchronized (
STATE.md,ROADMAP.md,REQUIREMENTS.md)
Phase: 03-live-ops-dashboard Completed: 2026-02-13